High Schools
100kW PV + 82.8kW SolarEdge inverter
network protection
Optimum performance and Return on Investment (ROI) was required for this project. SolarEdge DC optimised inverters were selected because of their safety, long design life, improved energy harvest and ease of installation hence providing the optimum ROI.
Each solar module has the ability to be remotely monitored to ensure that the array is performing at its peak.